MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS

This paper refers to the study of the efficiency of the constructed wetlands in the wastewater treatment, via mathematical modeling. The propose is to determine the stabilization limit value of removal of some parameters: Chemical Oxygen Demand (COD), Ammoniacal Nitrogen and Conductivity. The research considered a constructed wetland system, in an experimental scale, with different hydraulic retention time (HRT) for domestic wastewater treatment: 0, 2, 4, 6 and 8 days. The data were collected, analyzed and the results indicated, according to the Ford-Walford method, the removal stabilization limit values were, approximately, 90% for COD, 74% for Ammoniacal Nitrogen and 41% for Conductivity. According to the model, the hydraulic retention time to reach these removal indexes were 4 days for Ammoniacal Nitrogen and Conductivity and 10 days for COD. The evaluated parameters have demonstrated to be sensitive to the biological wastewater treatments by constructed wetland, the model made it possible to determine the limit values and the stabilization time and the hydraulic retention time has showed an important factor of the management of such systems, that must be monitored, in order to optimize the parameters removal and the efficiency of the treatment.

Saved in:
Bibliographic Details
Main Authors: Poletti, Elaine Cristina Catapani, Martins, Junia Teixeira, Pires, Marta Siviero Guilherme
Format: Digital revista
Language:eng
Published: Instituto de Ingeniería, Universidad Nacional Autónoma de México 2021
Online Access:https://www.revistas.unam.mx/index.php/aidis/article/view/75608
Tags: Add Tag
No Tags, Be the first to tag this record!
id rev-aidis-mx-article-75608
record_format ojs
spelling rev-aidis-mx-article-756082021-12-06T14:18:01Z MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS Poletti, Elaine Cristina Catapani Martins, Junia Teixeira Pires, Marta Siviero Guilherme efficiency of a constructed wetland hydraulic retention time stabilization limit value This paper refers to the study of the efficiency of the constructed wetlands in the wastewater treatment, via mathematical modeling. The propose is to determine the stabilization limit value of removal of some parameters: Chemical Oxygen Demand (COD), Ammoniacal Nitrogen and Conductivity. The research considered a constructed wetland system, in an experimental scale, with different hydraulic retention time (HRT) for domestic wastewater treatment: 0, 2, 4, 6 and 8 days. The data were collected, analyzed and the results indicated, according to the Ford-Walford method, the removal stabilization limit values were, approximately, 90% for COD, 74% for Ammoniacal Nitrogen and 41% for Conductivity. According to the model, the hydraulic retention time to reach these removal indexes were 4 days for Ammoniacal Nitrogen and Conductivity and 10 days for COD. The evaluated parameters have demonstrated to be sensitive to the biological wastewater treatments by constructed wetland, the model made it possible to determine the limit values and the stabilization time and the hydraulic retention time has showed an important factor of the management of such systems, that must be monitored, in order to optimize the parameters removal and the efficiency of the treatment. Instituto de Ingeniería, Universidad Nacional Autónoma de México 2021-12-06 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Artículos evaluados por pares Investigación aplicada Artículos evaluados por pares Artículos evaluados por pares application/pdf https://www.revistas.unam.mx/index.php/aidis/article/view/75608 10.22201/iingen.0718378xe.2021.14.3.75608 Revista AIDIS de Ingeniería y Ciencias Ambientales. Investigación, desarrollo y práctica; Vol. 14, No. 3, 6 de diciembre de 2021; 1463-1474 Revista AIDIS de Ingeniería y Ciencias Ambientales. Investigación, desarrollo y práctica; Vol. 14, No. 3, 6 de diciembre de 2021; 1463-1474 Revista AIDIS de Ingeniería y Ciencias Ambientales. Investigación, desarrollo y práctica; Vol. 14, No. 3, 6 de diciembre de 2021; 1463-1474 0718-378X 10.22201/iingen.0718378xe.2021.14.3 eng https://www.revistas.unam.mx/index.php/aidis/article/view/75608/71493 Derechos de autor 2021 Revista AIDIS de Ingeniería y Ciencias Ambientales. Investigación, desarrollo y práctica
institution UNAM MX
collection OJS
country México
countrycode MX
component Revista
access En linea
databasecode rev-aidis-mx
tag revista
region America del Norte
libraryname Biblioteca de Instituto de Ingeniería de la UNAM de México
language eng
format Digital
author Poletti, Elaine Cristina Catapani
Martins, Junia Teixeira
Pires, Marta Siviero Guilherme
spellingShingle Poletti, Elaine Cristina Catapani
Martins, Junia Teixeira
Pires, Marta Siviero Guilherme
MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
author_facet Poletti, Elaine Cristina Catapani
Martins, Junia Teixeira
Pires, Marta Siviero Guilherme
author_sort Poletti, Elaine Cristina Catapani
title MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
title_short MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
title_full MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
title_fullStr MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
title_full_unstemmed MODELING OF THE LIMIT VALUE FOR REMOVING PARAMETERS BY CONSTRUCTED WETLANDS
title_sort modeling of the limit value for removing parameters by constructed wetlands
description This paper refers to the study of the efficiency of the constructed wetlands in the wastewater treatment, via mathematical modeling. The propose is to determine the stabilization limit value of removal of some parameters: Chemical Oxygen Demand (COD), Ammoniacal Nitrogen and Conductivity. The research considered a constructed wetland system, in an experimental scale, with different hydraulic retention time (HRT) for domestic wastewater treatment: 0, 2, 4, 6 and 8 days. The data were collected, analyzed and the results indicated, according to the Ford-Walford method, the removal stabilization limit values were, approximately, 90% for COD, 74% for Ammoniacal Nitrogen and 41% for Conductivity. According to the model, the hydraulic retention time to reach these removal indexes were 4 days for Ammoniacal Nitrogen and Conductivity and 10 days for COD. The evaluated parameters have demonstrated to be sensitive to the biological wastewater treatments by constructed wetland, the model made it possible to determine the limit values and the stabilization time and the hydraulic retention time has showed an important factor of the management of such systems, that must be monitored, in order to optimize the parameters removal and the efficiency of the treatment.
publisher Instituto de Ingeniería, Universidad Nacional Autónoma de México
publishDate 2021
url https://www.revistas.unam.mx/index.php/aidis/article/view/75608
work_keys_str_mv AT polettielainecristinacatapani modelingofthelimitvalueforremovingparametersbyconstructedwetlands
AT martinsjuniateixeira modelingofthelimitvalueforremovingparametersbyconstructedwetlands
AT piresmartasivieroguilherme modelingofthelimitvalueforremovingparametersbyconstructedwetlands
_version_ 1755914505556066304