Mine fleet cost evaluation - Dijkstra's optimized path

Abstract The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.

Saved in:
Bibliographic Details
Main Authors: Souza,Felipe Ribeiro, Câmara,Taís Renata, Torres,Vidal Félix Navarro, Nader,Beck, Galery,Roberto
Format: Digital revista
Language:English
Published: Fundação Gorceix 2019
Online Access:http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300321
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:scielo:S2448-167X2019000300321
record_format ojs
spelling oai:scielo:S2448-167X20190003003212019-03-19Mine fleet cost evaluation - Dijkstra's optimized pathSouza,Felipe RibeiroCâmara,Taís RenataTorres,Vidal Félix NavarroNader,BeckGalery,Roberto fleet costs Dijkstra optimized path transport time transport distance Abstract The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.info:eu-repo/semantics/openAccessFundação GorceixREM - International Engineering Journal v.72 n.2 20192019-06-01info:eu-repo/semantics/articletext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300321en10.1590/0370-44672018720124
institution SCIELO
collection OJS
country Brasil
countrycode BR
component Revista
access En linea
databasecode rev-scielo-br
tag revista
region America del Sur
libraryname SciELO
language English
format Digital
author Souza,Felipe Ribeiro
Câmara,Taís Renata
Torres,Vidal Félix Navarro
Nader,Beck
Galery,Roberto
spellingShingle Souza,Felipe Ribeiro
Câmara,Taís Renata
Torres,Vidal Félix Navarro
Nader,Beck
Galery,Roberto
Mine fleet cost evaluation - Dijkstra's optimized path
author_facet Souza,Felipe Ribeiro
Câmara,Taís Renata
Torres,Vidal Félix Navarro
Nader,Beck
Galery,Roberto
author_sort Souza,Felipe Ribeiro
title Mine fleet cost evaluation - Dijkstra's optimized path
title_short Mine fleet cost evaluation - Dijkstra's optimized path
title_full Mine fleet cost evaluation - Dijkstra's optimized path
title_fullStr Mine fleet cost evaluation - Dijkstra's optimized path
title_full_unstemmed Mine fleet cost evaluation - Dijkstra's optimized path
title_sort mine fleet cost evaluation - dijkstra's optimized path
description Abstract The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.
publisher Fundação Gorceix
publishDate 2019
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300321
work_keys_str_mv AT souzafeliperibeiro minefleetcostevaluationdijkstrasoptimizedpath
AT camarataisrenata minefleetcostevaluationdijkstrasoptimizedpath
AT torresvidalfelixnavarro minefleetcostevaluationdijkstrasoptimizedpath
AT naderbeck minefleetcostevaluationdijkstrasoptimizedpath
AT galeryroberto minefleetcostevaluationdijkstrasoptimizedpath
_version_ 1756441793448116224